![]() ![]() Install a non-restrictive lubricated plug valve in the gas line close to the boiler. Install a full-sized sediment trap at the low point in gas line upstream of gas valve.Attach vent damper cable to cable clamp on boiler left panel and join the Molex connector (see Figures 2.4 & 2.4A). Install flue pipe over top of vent damper and secure to damper housing with sheet metal screws or pop rivets.Condensate return piping should be connected to boiler through a 'Hartford Loop.' Supply outlet must run full size from the boiler to a header at least 24' above top of boiler.Observe the following minimum clearances to combustibles: 18'. Locate boiler so connecting flue pipe between draft hood and chimney is as short as possible. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |